SHOWCASING QUALITY CRAFTSMANSHIP
What was delivered:
All major earthworks working around and adjacent to live services
Installation of sub structure piles 16no. 9500mm Deep with pile caps 1000mm deep x 4500mm long
Installation of Structural Steel Super Structure to support the new super screen 28.6m long x 13.5m in height
Gantry walkways on all levels at the rear with Ladder access
Black ACM Paneling boarder to the screen
Finish Lynx Data Integration
Silks Interface
Power upgrade to ensure sufficient power to the screen from 160AMPs to 250AMPs including new breaker upgrades 400AMPs



