Queenslea Aged Care Apartment Upgrades
What was delivered:
- Apartment Reconfiguration: Converted seven 2-bedroom apartments into three 3-bedroom apartments on the Ground Floor and First Floor.
- Design and Documentation: Completed full design documentation, ensuring all aspects of the new apartment layouts were thoroughly planned and detailed.
- Construction Management: Provided comprehensive construction management throughout the project, overseeing all stages of the upgrade process.
- Interior Works: Executed partitioning, ceiling works, and joinery to align with the new apartment configurations.
- Service Adjustments: Adjusted existing services, including electrical and plumbing, to accommodate the revised apartment layouts.
- Occupied Environment: Successfully managed construction works while occupants continued living in adjacent apartments, ensuring minimal disruption and maintaining a safe environment.
Challenges:
- Occupied Environment: Managing construction while existing occupants were living in adjacent apartments presented logistical and safety challenges, requiring careful planning and coordination to minimize disruption.
- Design Complexity: The reconfiguration of apartment layouts required detailed design work to ensure that the new configurations met both aesthetic and functional requirements while integrating seamlessly with existing infrastructure.
- Service Adjustments: Modifying existing services, such as electrical and plumbing systems, to fit the new apartment layouts involved complex adjustments and coordination to ensure that all systems functioned correctly and efficiently.
- Compliance and Quality Control: Maintaining high standards of quality and compliance with building codes and regulations throughout the upgrade process was crucial to ensuring a successful outcome.
Completion date:
November 2024


